background image

2

61287737F3-13A

I

NSTALLATION

After unpacking the ONT, inspect it for damage. If damage is 
noted, file a claim with the carrier and then contact ADTRAN. For 
more information, refer to the warranty.

Installation Guidelines

The following are guidelines for this installation.

Read all warnings, cautions, notes, and installation 
instructions before installing or servicing the ONT.

For fiber installation, not all units have a screw for protective 
cover removal. The cover on some units simply slides off.

If you disconnect the UPS while in use, the ONT is not 
protected from power outages and will send a “Battery 
Missing” alarm to the OLT.

If AOE Auto Upgrade is active, a new ONT installation will be 
detected and a new software download will commence. This 
may take 5 to 10 minutes to complete.

g

     NOTE

Do not mount the product higher than 6.6 ft (2 m) from the floor.

Installation Overview

To install the ONT, you will need to do the following:

Step 1: Position the ONT

Step 2: Connect POTS

Step 3: Connect Ethernet

Step 4: Install Fiber

Step 5: Connect Power

Required Tools

The installation of the ONT requires Standard technician tools and 
those listed below.

Carpenter’s level

RJ-45/RJ-11 crimper

A telephony/data communication test set

PON power meter with wavelength filtering

Fiberscope or videoscope

Two #8 Pan Head screws (1 inch or greater in length)

Assorted tie wraps for securing cabling and wiring

Fiber optic connections require the following:

Fiber optical fusion splice tools

ODC Fiber cleaning tool

SC Fiber connector

Installation Steps

To install the ONT, complete the following steps:

Step 1: Position the ONT

The ONT can be placed on a desk or wall mounted.

g

     NOTE

Do not mount the product higher than 6.6 ft (2 m) from the floor.

Desk Top Placement

When placing on a desk, ensure the ONT is not located in direct 
sunlight or next to any thermal obstructions.

Wall Mount Installation

Refer to 

Figure 1

 when installing the ONT on a wall.

To wall mount the ONT, complete the following steps:

1. Determine a location for the ONT. 

Figure 1. Wall Mount

2. Attach a 1/4 inch mounting board (typically plywood) to the 

wall. If the wall is drywall construction, ensure the mounting 
board is supported by the wall studs.

3. Install two #8 Pan Head screws (1 inch or greater in length) 

using the key holes on the back of the ONT as location 
markers. Leave approximately 1/4 inch protruding from the 
mounting surface.

4. Slide the ONT over the Pan Head screws and exert a small 

amount of downward pressure to ensure that the top of the 
slots are resting on the shafts of the Pan Head screws.

Rear of ONT

Wall Screw (4x)

Mounting Screw (2x)

Mounting Board

Содержание Total Access 324E

Страница 1: ...tionally by a customer provided Uninterruptible Power Supply UPS AC DC Power Adapter The power feed is supplied through a 12 VDC Power Adapter that is included with the ONT The Power Adapter operates from a wall socket input of 100 240 VAC 50 60 Hz with a nominal output of 12 VDC The total power consumption with 4 Ethernet Ports running and both POTS lines off hook is approximately 13 0 Watts UPS ...

Страница 2: ...ion test set PON power meter with wavelength filtering Fiberscope or videoscope Two 8 Pan Head screws 1 inch or greater in length Assorted tie wraps for securing cabling and wiring Fiber optic connections require the following Fiber optical fusion splice tools ODC Fiber cleaning tool SC Fiber connector Installation Steps To install the ONT complete the following steps Step 1 Position the ONT The O...

Страница 3: ...ailure to deploy as described could result in permanent damage from lightning or other electrical events and voids the Warranty If it is necessary to connect the ports to remote outdoor equipment or between structures then add an appropriate protection device per the following ADTRAN s Ethernet Port Protection Device EPPD P N 1700502G1 must be connected between the unit and the outside plant cable...

Страница 4: ...n Battery 1 3 UPS Status Battery Missing 2 4 Signal Return 5 Power 12 V Return 6 UPS Status Replace Battery 3 7 UPS Status Low Battery 4 8 No Connection 8 7 6 5 4 3 2 1 Step 4 Install Fiber C CAUTION LASER RADIATION 1310 nm to 1490 nm Do not view directly with optical instruments This product contains a Class 1 Laser module that complies with FDA 21 CFR 1040 10 1040 11 and IEC 60825 1 Fiber is ins...

Страница 5: ...the ONT Electrical Nominal Voltage 12 0 VDC Minimum Voltage 10 0 VDC Maximum Voltage 13 9 VDC Power Consumption 1 06 Amps 12 0 VDC AC Power Included Switching Adapter input range of 100 240 VAC 50 60 Hz with a nominal output of 12 VDC Optical TX min power 5 5 dBm TX max power 1 0 dBm RSSI max sensitivity 27 0 dBm RX overload 8 dBm TX wavelength 1310 nm typical RX wavelength 1490 nm typical Physica...

Страница 6: ...opyright 2020 ADTRAN Inc All Rights Reserved ADTRAN CUSTOMER CARE From within the U S 1 888 423 8726 From outside the U S 1 256 963 8716 PRICING AND AVAILABILITY 1 800 827 0807 61287737F3 13A Documentation for ADTRAN Network Solutions products is available for viewing and download directly from the ADTRAN Support Community website Go to https supportforums adtran com welcome Registration is requir...

Отзывы: