10-3
FINAL TRANSMISSION
Bearing installation
•
Use the tool press the bearing outer
ring when install into crankcase or
mission
cover.
Attentio
n:
*
The bearings have to be pressed on
outer ring to avoid damage of
bearings.
Final transmission installation
•
Install the main gear assembly and
final gear shaft into crankcase.
•
Install the final gear onto shaft.
•
Install new gasket and dowel pins.
•
Install the mission cover and bolts.
Locking torque :
1.2 kg-m
•
assembly the gear set and mission in
reverse sequence
•
Fill in final transmission gear oil into
gear
box.
Recommend oil :
85W/140
SAE#90
Exchange :
300 c.c.
Disassembly
:
350 c.c.
Содержание GK-125R
Страница 1: ...SERVICE MANUAL GK 125R 92 61 July 04 High Power Engine HER CHEE INDUSTRIAL CO LTD...
Страница 111: ......