ii
•
Table of Contents
Chapter 3 Getting Started........................................................... 25
3.1
CPU Installation ........................................................................... 25
3.2
Memory Installation ....................................................................... 26
3.2.1
Memory Configuration Options ....................................... 26
3.2.2
Installing Memory Modules ............................................. 26
3.3
Connecting IDE Devices to the NuPRO-900A............................... 27
3.4
BIOS Configuration Overview ....................................................... 28
3.5
Operating System Installation ....................................................... 29
Chapter 4 Device Driver Installation.......................................... 31
4.1
Intel® E7501 Chipset .................................................................... 31
4.1.1
System Requirements..................................................... 31
4.1.2
Hardware Configuration File Installation ......................... 32
4.2
Driver Installation .......................................................................... 32
4.2.1
VGA Driver Installation.................................................... 32
4.2.2
LAN Driver Installation .................................................... 33
Chapter 5 Watchdog Timer......................................................... 35
5.1
Watchdog Timer Overview ............................................................ 35
5.1.1
Using the Watchdog in an Application ............................ 36
Chapter 6 ePCI-X Bus Details..................................................... 37
6.1
NuPRO-900A ePCI-X Bus............................................................. 37
6.2
Global Signals ............................................................................... 37
6.2.1
Standby Supply (+3.3Vaux) ............................................ 37
6.2.2
ATX Support ................................................................... 37
6.2.3
JTAG 37
6.2.4
I
2
C Bus............................................................................ 37
6.2.5
PME# .............................................................................. 38
6.3
PCI-X Bus Signals......................................................................... 38
6.3.1
Backplane Present.......................................................... 38
6.3.2
VIO Electrical Keying ...................................................... 38
6.3.3
M66EN and PCIXCAP .................................................... 38
6.3.4
REQ/GNT Signals........................................................... 38
6.4
Extended Features ........................................................................ 38
Warranty Policy ........................................................................... 39
Содержание NuPRO-900A
Страница 2: ...NuPRO 900A Full Size ePCI X System Host Board with Dual Xeon CPU User s Guide Recycled Paper ...
Страница 3: ......
Страница 14: ...Introduction 5 Main Board Drawing Figure 2 Main Board Drawing ...
Страница 21: ......
Страница 32: ...Jumpers and Connectors 23 2 3 Clear CMOS Use one conductor to touch JP2 pin1 2 to clear CMOS JP2 3 2 1 ...
Страница 33: ......
Страница 39: ......
Страница 43: ......