GB 03433 - Edition Edition 03 - October 09
7/9
A Commissioning
B Product
description
C Settings
D Test
mode
E RS232
mode
F Appendices
Quick commissioning procedure
Bringing the ACS2000
on line
1 - Place the ACS 2000 controller on a table
2 - Connect the vacuum gauge to the connection at the back of the
controller.
3 - Connect the mains power cable
1
2
3
4
4 - Set the power switch to the «1» (ON) position.
Products which are not properly connected to ground are a danger to life
in the event of failure.
The controller frame must be connected to earth and an earth wire is
provided for this purposes in the 3-pin power cable (PE).
Always connect the power cable to a socket with a ground.