Before
You Begin
·
Safety Guidelines
8
Before You Begin
Before going through with this manual, you should read and focus to the following safety guidelines.
Notes about the subsystem product packaging and delivery are also included.
Safety Guidelines
To provide reasonable protection against any harm on the part of the user and to obtain maximum
performance, user is advised to be aware of the following safety guidelines particularly in handling
hardware components:
Upon receiving of the product:
Place the product in its proper location.
To avoid unnecessary dropping out, make sure that somebody is aound for immediate assistance.
It should be handled with care to avoid dropping that may cause damage to the product. Always use
the correct lifting procedures.
Upon installing of the product:
Ambient temperature is very important for the installation site. It must not exceed 30
°
C. Due to
seasonal climate changes; regulate the installation site temperature making it not to exceed the
allowed ambient temperature.
Before plugging-in any power cords, cables and connectors, make sure that the power switches are
turned off. Disconnect first any power connection if the power supply module is being removed from
the enclosure.
Outlets must be accessible to the equipment.
All external connections should be made using shielded cables and as much as possible should not
be performed by bare hand. Using anti-static hand gloves is recommended.
In installing components, secure all the mounting screws and locks. Make sure that all screws are
fully tightened. Follow correctly all the listed procedures in this manual for reliable performance.
Packaging, Shipment and Delivery
Before removing the subsystem from the shipping carton, you should visually inspect the physical
condition of the shipping carton.
Unpack the subsystem and verify that the contents of the shipping carton are all there and in good
condition.
Exterior damage to the shipping carton may indicate that the contents of the carton are damaged.
If any damage is found, do not remove the components; contact the dealer where you purchased the
subsystem for further instructions.
Содержание actiNAS cube RDX
Страница 27: ...27 Overview of the NAS Setup Phases Installation Please refer to page 30 for more information ...
Страница 60: ... actiNAS Manager Storage Share 60 7 Click Save when done Then Share Folder will be created ...
Страница 73: ...73 Storage Share actiNAS Manager ...
Страница 126: ... actiNAS Manager System 126 8 Select search tab for search options 9 Click the logout link to logout ...
Страница 155: ...155 File Manager actiNAS Manager Admin is logged in Local user testuser is logged in ...