172
Copyright © Acronis, Inc., 2000-2010
6.1.2.2
Working with backup plans and tasks
Actions on backup plans and tasks
The following is a guideline for you to perform operations with backup plans and tasks.
To
Do
Create a new backup plan,
or a task
Click
New
, then select one of the following:
Backup plan (p. 181)
Recovery task (p. 200)
Validation task (p. 219)
View details of a plan/task
Click
Backup plan
View details
.
In the
Plan Details
(p. 178) window, review the plan details.
Click
Task
View details
.
In the
Task Details
(p. 176) window, review the task details.
View plan's/task's log
Backup plan
Click
View log
.
You will be taken to the
Log
(p. 179) view containing the list of the plan-related
log entries.
Task
Click
View log
.
You will be taken to the
Log
(p. 179) view containing the list of the task-related
log entries.
Run a plan/task
Backup plan
Click
Run
.
In the
Run Backup Plan
(p. 176) window, select the task you need to be run.
Running the backup plan starts the selected task of that plan immediately in
spite of its schedule and conditions.
Why can't I run the backup plan?
Do not have the appropriate privilege
Without the Administrator privileges on the machine, a user cannot run
plans owned by other users.
Task
Click
Run
.
The task will be executed immediately in spite of its schedule and conditions.