109
•
Mechanical loading
Exercise care when mounting the system in a rack to avoid any
accidents.
•
Circuit overloading
Appropriate consideration should be given when connecting the
supply circuit to the system to avoid any circuit overload. The
system name plate rating should be used when addressing
concerns about circuit overload.
Содержание AT310 F1 Series
Страница 1: ...AT310 F1 Series User Guide ...
Страница 14: ...xiv ...
Страница 18: ...xviii ...
Страница 19: ...1 System tour ...
Страница 34: ...1 System tour 16 ...
Страница 35: ...2 System setup ...
Страница 44: ...2 System setup 26 ...
Страница 45: ...3 System upgrades ...
Страница 74: ...3 System upgrades 56 ...
Страница 75: ...4 System BIOS ...
Страница 108: ...4 System BIOS 90 ...
Страница 109: ...5 System troubleshooting ...
Страница 119: ...Appendix A Server management tools ...
Страница 125: ...Appendix B Rack mount configuration ...
Страница 132: ...Appendix B Rack mount configuration 114 4 Install the rail bracket to the inner rails by using two screws for each side ...
Страница 133: ...115 5 Extend the middle sliding piece of each mounting rail forward until you hear an audible click ...
Страница 137: ...Appendix C Acer Smart Console ...
Страница 149: ...131 FRU Reading Provides information about major system components including chassis mainboard and product information ...
Страница 176: ...158 troubleshooting 99 user password 80 ...