![Acer Altos G540 M2 Series Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/acer/altos-g540-m2-series/altos-g540-m2-series_user-manual_8192044.webp)
2 System setup
34
2
Press the power button.
The system starts up and displays a welcome message on the
monitor.
After that, a series of power-on self-test (POST) messages
appears. The POST messages indicate if the system is running well
or not.
Note:
If the system does not turn on or boot after pressing the
power button, go to the next section for the possible causes of the
boot failure.
Aside from the POST messages, you can determine if the system is in
good condition by checking if the following occurred.
•
The power status indicator on the front panel lights up green.
•
The Num Lock, Caps Lock, and Scroll Lock indicators on the
keyboard light up.
Power-on problems
If the system fails to boot after you have applied power, check the
following factors that might have caused the boot failure.
•
The external power cord may be loosely connected.
Check the power cord connection from the power outlet to the
power cord socket on the rear panel. Make sure that the cord is
Содержание Altos G540 M2 Series
Страница 1: ...Acer Altos G540 M2 Series User s Guide ...
Страница 10: ...x ...
Страница 11: ...1 System tour ...
Страница 30: ...1 System tour 20 60 CPU2 Processor 2 Socket No Code Description ...
Страница 38: ...1 System tour 28 ...
Страница 39: ...2 System setup ...
Страница 49: ...3 System upgrade ...
Страница 59: ...49 2 Remove the cage from the HDD bay 4 Observe the post installation instructions described on page 42 ...
Страница 69: ...59 2 Detach the plastic frame from the HDD carrier ...
Страница 77: ...67 2 Connect the power and SATA cables to the new 5 25 inch drive ...
Страница 103: ...93 To install a hot swap power supply module 1 Detach the cover from the chassis Keep the cover for future reassembly ...
Страница 105: ...4 System BIOS ...
Страница 112: ...4 System BIOS 104 Processor Configuration ...
Страница 122: ...4 System BIOS 114 Intel VT for Directed I O VT d ...
Страница 143: ...5 System troubleshooting ...
Страница 154: ...5 System troubleshooting 146 ...
Страница 155: ...Appendix A Server management tools ...
Страница 156: ...This appendix gives an overview of the different server management tools supported by your server ...
Страница 165: ...Appendix B Rack mount configuration ...
Страница 166: ...This appendix shows you how to set up the Altos G540 M2 server in a rack mount configuration ...
Страница 174: ...Appendix B Rack mount configuration 166 6 Fully extend the mounting rails on the rack ...
Страница 177: ...169 7 Route all cables through the cable clips ...
Страница 178: ...Appendix B Rack mount configuration 170 ...
Страница 179: ...Appendix C Altos eXpress Console ...
Страница 180: ...This appendix familiarize you to a standard web browser with a nice graphical user interface ...
Страница 214: ...Appendix C Altos eXpress Console 206 1600 x 1400 16bit 60Hz 65Hz 70Hz Screen Resolution Color Quality Refresh Rate ...