![Acer Altos G540 M2 Series Скачать руководство пользователя страница 150](http://html.mh-extra.com/html/acer/altos-g540-m2-series/altos-g540-m2-series_user-manual_8192150.webp)
5 System troubleshooting
142
Specific problems and corrective
actions
Listed below are specific problems that may arise during the use of
your server and their possible solutions.
Power indicator does not light.
Do the following:
•
Make sure the power supply module is properly installed.
•
Make sure the power cord is connected correctly.
•
Make sure that the wall outlet has power. Test it by plugging
another device.
•
Make sure the power indicator on the front panel is lit up green.
•
Remove all add-in cares and see if the system boots.
If reboot is successful, install the cards back in one at a time with a
reboot between each addition to determine if one of them is
causing the problem.
•
Make sure that you have properly installed system compliant
memory modules, and that there populated according to the
system guidelines.
•
Make sure that you have installed system compliant processors,
and that there populated according to the system guidelines.
Содержание Altos G540 M2 Series
Страница 1: ...Acer Altos G540 M2 Series User s Guide ...
Страница 10: ...x ...
Страница 11: ...1 System tour ...
Страница 30: ...1 System tour 20 60 CPU2 Processor 2 Socket No Code Description ...
Страница 38: ...1 System tour 28 ...
Страница 39: ...2 System setup ...
Страница 49: ...3 System upgrade ...
Страница 59: ...49 2 Remove the cage from the HDD bay 4 Observe the post installation instructions described on page 42 ...
Страница 69: ...59 2 Detach the plastic frame from the HDD carrier ...
Страница 77: ...67 2 Connect the power and SATA cables to the new 5 25 inch drive ...
Страница 103: ...93 To install a hot swap power supply module 1 Detach the cover from the chassis Keep the cover for future reassembly ...
Страница 105: ...4 System BIOS ...
Страница 112: ...4 System BIOS 104 Processor Configuration ...
Страница 122: ...4 System BIOS 114 Intel VT for Directed I O VT d ...
Страница 143: ...5 System troubleshooting ...
Страница 154: ...5 System troubleshooting 146 ...
Страница 155: ...Appendix A Server management tools ...
Страница 156: ...This appendix gives an overview of the different server management tools supported by your server ...
Страница 165: ...Appendix B Rack mount configuration ...
Страница 166: ...This appendix shows you how to set up the Altos G540 M2 server in a rack mount configuration ...
Страница 174: ...Appendix B Rack mount configuration 166 6 Fully extend the mounting rails on the rack ...
Страница 177: ...169 7 Route all cables through the cable clips ...
Страница 178: ...Appendix B Rack mount configuration 170 ...
Страница 179: ...Appendix C Altos eXpress Console ...
Страница 180: ...This appendix familiarize you to a standard web browser with a nice graphical user interface ...
Страница 214: ...Appendix C Altos eXpress Console 206 1600 x 1400 16bit 60Hz 65Hz 70Hz Screen Resolution Color Quality Refresh Rate ...