The following steps must be taken prior to initial start-up of the machine.
A. Uncrate Machine
1. Uncrate & unwrap machine. Unwrap the gun and place it in it’s holster.
2. Attach the supply hoses PER COLOR & SIZE to the gun. Push hoses tight in fittings to assure a
proper fit
B. Connect power and Air
1. Attach the power (115V single) and air to the machine.
2. The air connection is a 3/8” NPT thread. We recommend you use a 3/8” air
hose connect to the machine.
3. You may use a quick coupler or if you want to leave an air hose connected
to the machine we recommend you put a shut off valve on the inlet so you can
turn the air off when you are done. (AIR NOISE AROUND THE SINGULA-
TOR UNIT IS NORMAL WHEN AIR IS ON. There is no air leaking, it is
a venturi effect causing the noise. The air that blows the dowel to the gun is
pulled into the hose. The air being pulled into the hose makes the sound.)
C. Load dowels into machine
1. Put the dowels into the hopper.
2. DO NOT FILL THE TUBE WITH DOWELS. The machine only shoots one dowel at a time
through the tube to the gun.
3. Never push a dowel into the gun through the nozzle fingers.
4. Turn the bowl speed up so the dowels feed into the singulator. Set the speed so when cycling the
machine the dowels feed fast enough to keep up with the operator.
5. Align the singulator, so dowels feed smoothly.
Start Up Procedures
Содержание DD
Страница 19: ...Pneumatic Diagram...
Страница 20: ...Electric Diagram...
Страница 22: ...Dowel Feed Bowl 1 Vibrating Bowl G2404 2 Dowel Rail Bar M2208 3 Dowel Exit Block M2209...
Страница 27: ...Electric Diagram...