54
Z E N ITH Z TG ( D/C T ) T-S E R I E S 16 0 0 -3 0 0 0 A
1
LC
D
Measurements
Switch Diagnostics
Total operations
I-O-II switches: Total number of transfers I-O, O-II, II-O
and O-I.
I-II switches: Total number of transfers I-II and II-I.
Manual operations
Total transfers operated by the handle.
Number of load transfers
Total number of transfers I-II and II-I.
Transfer time
Time it took to transfer the load between sources (ms).
Source fail transfers
Total number of automatic transfers due to source
failures.
Days energized
Total time on S1
Hours
Total time on S2
Hours
Time S1 available
Minutes
Time S2 available
Minutes
Last generator start
MMM DD, YYYY hh:mm:ss
Generator starting time
How long it took for the generator to become
acceptable after latest start (s).
In-phase time
How long it took for the in-phase monitor to achieve
synchronized transfer (s).
Event Log
View Log
250 time stamped events, latest first.
Clear Log
Delete all log entries.
Harmonics
Harmonic components up to 15th are calculated for
the selected phase.
Measured
Phase
Disabled*
Phase 2
Phase 3
Voltage
Total distortion THD for each phase of both voltage sources.
S1 Components Each harmonic component of the selected S1 phase.
S2 Components Each harmonic component of the selected S2 phase.
Power Factor
Enabled only when current measurement module is
connected.
Содержание Zenith ZTG T Series
Страница 2: ...2 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 6: ...6 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 10: ...10 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 38: ...38 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 60: ...60 ZENITH ZTG D CT T SERIES 1600 3000 A 1 LCD ...
Страница 104: ...104 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 116: ...2 116 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 120: ...2 120 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 123: ...123 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...