52
Z E N ITH Z TG ( D/C T ) T-S E R I E S 16 0 0 -3 0 0 0 A
1
LC
D
Parameters
(continued)
*Default
Device Parameters (continued)
Generator Exercisers
Switch and generator functioning can be tested
automatically and also periodically by using four
independent exerciser events.
Test on load function starts the generator and
transfers the load to it. Test off load function only
starts the generator for the duration of the event.
Overlapping events are prioritized, event 1 has the
highest priority.
Exerciser 1 / 2 / 3 / 4
Status
Disabled*
Non-periodic
Daily
Weekly
Bi-weekly
Monthly
Yearly
Function
No Function*
Test on Load
Test off Load
Duration
(hh:mm:ss)
00:00:00...24:00:59 (00:01:00*)
Time (hh:mm)
Starting time of the event: 00:00*...23:59
Date (month
day, year)
Starting date of the event
Jan 01, 2020... (---*)
Application
S1-Transformer/S2-Generator*
S2-Transformer/S1-Generator
2 Transformers/S1 Priority
2 Transformers/S2 Priority
2 Transformers/No Priority
Commit Transfer
Off*
If priority source fails, device cancels the transfer
sequence to non-priority source (generator) if
priority source returns before non-priority source
becomes acceptable.
On
If priority source fails, device continues transfer
sequence to non-priority source (generator)
even if priority returns before non-priority source
becomes acceptable. Retransfer sequence
according to time delays.
Continued on the next page
Содержание Zenith ZTG T Series
Страница 2: ...2 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 6: ...6 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 10: ...10 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 38: ...38 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 60: ...60 ZENITH ZTG D CT T SERIES 1600 3000 A 1 LCD ...
Страница 104: ...104 1 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 116: ...2 116 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 120: ...2 120 ZENITH ZTG D CT T SERIES 1600 3000 A ...
Страница 123: ...123 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...