Tap change timeout duration - effectively the maximum transformer tap
change time,
tTCTimeout
, available on the local HMI under
Main menu/
Settings/IED Settings/Control/TCMYLTC (84)/1:TCMYLTC/
tTCTimeout
.
•
Load tap changer pulse duration - required length of pulse from IED to
load tap changer,
tPulseDur
, available on the local HMI under
Main
menu/Settings/IED Settings/Control/TCMYLTC (84)/1:TCMYLTC/
tPulseDur
.
•
Transformer tap range,
LowVoltTap
and
HighVoltTap
, available on the
local HMI under
Main menu/Settings/IED Settings/Control/
TCMYLTC (84)/1:TCMYLTC/LowVoltTap
and
Main menu/
Settings/IED Settings/Control/TCMYLTC (84)/1:TCMYLTC/
HighVoltTap
.
•
Load tap changer code type - method for digital feedback of tap position,
CodeType
, available on the local HMI under
Main menu/Settings/IED
Settings/Control/TCMYLTC (84)/1:TCMYLTC/CodeType
.
During the installation and commissioning, the behavior of the
voltage control functions for different tests may be governed by a
parameter group, available on the local HMI under
Main menu/
Settings/IED Settings/Control/TR8ATCC/1:TR8ATCC/
General
. These parameter settings can cause a Total Block,
Automatic Block or Alarm for a variety of system conditions
including over and under voltage, over current and tap changer
failure. It is important to review these settings and confirm the
intended response of the voltage control function for different
secondary injection tests.
Terminology
The busbar voltage UB is a shorter notation for the measured voltages Ua, Ub, Uc
or Uij, where Uij is the phase-phase voltage, Uij = Ui -Uj, or Ui, where Ui is one
single-phase-to-earth voltage.
I
L
is a shorter notation for the measured load current; it is to be used instead of the
three-phase quantities Ia, Ib, Ic or the two-phase quantities Ii and Ij, or single-phase
current Ii.
Also note that for simplicity local HMI menu structures included in the following
procedure are referred to universally as TR8ATCC, for example,
Main menu/
Settings/IED Settings/Control/TR8ATCC/1:TR8ATCC/Time/t1
.
6.7.1.1
Secondary test
The voltage control function performs basic voltage regulation by comparing a
calculated load voltage (U
L
) against a voltage range defined by setting
UDeadband
(with upper and lower limits U2 and U1 respectively). The calculated load voltage
1MRK 504 126-UEN -
Section 6
Testing functionality
67
Commissioning Manual
Содержание ret650
Страница 1: ...Relion 650 series Transformer protection RET650 Commissioning Manual...
Страница 2: ......
Страница 8: ......
Страница 14: ...6...
Страница 20: ...12...
Страница 26: ...18...
Страница 38: ...30...
Страница 46: ...38...
Страница 86: ...78...
Страница 108: ...100...
Страница 109: ...101...