Checking the binary I/O circuits..............................................................48
Binary input circuits............................................................................48
Binary output circuits......................................................................... 49
Checking optical connections................................................................. 49
Section 5 Configuring the IED and changing settings......................... 51
Overview.................................................................................................51
Configuring analog CT inputs................................................................. 52
Reconfiguring the IED.............................................................................52
Section 6 Establishing connection and verifying the SPA/IEC
communication.................................................................... 55
Verifying the communication...................................................................56
Section 7 Establishing connection and verifying the LON
communication.................................................................... 59
Communication via the rear ports ..........................................................59
LON communication.......................................................................... 59
The LON Protocol..............................................................................60
Hardware and software modules.......................................................60
Optical budget calculation for serial communication with LON ..............61
Section 8 Establishing connection and verifying the IEC 61850
communication.................................................................... 63
Overview.................................................................................................63
Setting the station communication..........................................................63
Verifying the communication...................................................................64
Section 9 Establishing connection and verifying the IEEE
C37.118/1344 communication.............................................65
Overview.................................................................................................65
Setting the PMU station communication (PMU Report)..........................65
Setting the PMU station communication (PMU configuration)................66
Setting the TCP/UDP client communication........................................... 67
Verifying the communication...................................................................70
Table of contents
2
Commissioning manual
Содержание RES670 2.1
Страница 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Commissioning manual ...
Страница 2: ......
Страница 14: ...8 ...
Страница 56: ...50 ...
Страница 60: ...54 ...
Страница 68: ...62 ...
Страница 86: ...80 ...
Страница 102: ...96 ...
Страница 178: ...172 ...
Страница 200: ...194 ...
Страница 201: ...195 ...