11.5.2
Two step overvoltage protection OV2PTOV (59)
Prepare the IED for verification of settings outlined in section
11.5.2.1
Verifying the settings
Verification of single-phase voltage and time delay to trip for Step 1
1.
Apply single-phase voltage below the set value
Pickup1
.
2.
Slowly increase the voltage until the PU_ST1 signal appears.
3.
Note the trip value and compare it with the set value
Pickup1
.
The trip value in secondary volts is calculated according to the
following equations:
For phase-to-ground measurement:
sec
100
3
Vpickup
VBase
VT
VTprim
>
´
´
ANSIEQUATION2426 V1 EN
(Equation 92)
For phase-to-phase measurement:
sec
100
Vpickup
VT
VBase
VTprim
>
´
´
ANSIEQUATION2427 V1 EN
(Equation 93)
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply about 20% higher voltage than the measured trip value for one phase.
6.
Measure the time delay for the TRST1 signal and compare it with the set value.
7.
Check the inverse time delay by injecting a voltage corresponding to 1.2 ×
Vpickup>.
8.
Repeat the test to check the inverse time characteristic at different over-voltage
levels.
9.
Repeat the above-described steps for Step 2 of the function.
11.5.2.2
Extended testing
1.
The tests above can be repeated for
2 out of 3
and for
3 out of 3
operation mode.
1MRK 511 366-UUS -
Section 11
Testing functionality by secondary injection
139
Commissioning manual
Содержание RES670 2.1
Страница 1: ...Relion 670 series Phasor measurement unit RES670 2 1 ANSI Commissioning manual ...
Страница 2: ......
Страница 14: ...8 ...
Страница 56: ...50 ...
Страница 60: ...54 ...
Страница 68: ...62 ...
Страница 86: ...80 ...
Страница 102: ...96 ...
Страница 178: ...172 ...
Страница 200: ...194 ...
Страница 201: ...195 ...