Section 3
Unpacking, inspecting and storing
3.1
Removing transport packaging
IEDs require careful handling.
1.
Examine the delivered products to ensure that they have not been damaged
during the transport.
2.
Remove the transport packing carefully without force.
3.
Attach the protective film (supplied with the IED) on the top side of the unit
for the installation phase.
Before connecting the auxiliary power, remove the protective
film from top of the IED.
The cardboard packaging material is 100% recyclable.
3.2
Inspecting the product
3.2.1
Identifying the product
1.
Locate the IED's order number from the label on top of the plug-in unit.
2.
Compare the IED's order number with the ordering information to verify that
the received product is correct.
3.2.2
Checking delivery items
Check that all items are included in the delivery in accordance with the delivery
documents.
3.2.3
Inspecting the IED
IEDs require careful handling before installation on site.
1MRS756375 K
Section 3
Unpacking, inspecting and storing
615 series
11
Installation Manual
Содержание Relion 615 series
Страница 1: ...Relion Protection and Control 615 series Installation Manual ...
Страница 2: ......
Страница 8: ......
Страница 11: ...Section 9 Glossary 73 Table of contents 615 series 3 Installation Manual ...
Страница 12: ...4 ...
Страница 78: ...70 ...
Страница 80: ...72 ...
Страница 82: ...74 ...
Страница 83: ...75 ...