![ABB REACT 2 Series Скачать руководство пользователя страница 94](http://html.mh-extra.com/html/abb/react-2-series/react-2-series_product-manual_4161094.webp)
- 94 -
000902AG
5 - Installation
E
xternal backup command connection
The REACT2 system is equipped with a BACKUP AC output that can
be activated in two different ways (Auto or via external control) settable
YLDZHEVHUYHUXVHULQWHUIDFHVHHWKHVSHFL¿FSDUDJUDSKRQFKDSWHU
In case of external control (BKP terminals) selection, backup output is
activated when terminal 1 is brought to the same potential as terminal
3 (i.e. positioning a switch to create a short circuit between the two
terminals on the communication and control signal terminal block
40
).
The condition of going into backup is shown on the synoptic.
Since this is a digital input, there are no requirements to be observed
as regards cable cross-section (it only needs to comply with the sizing
requirement for passing cables through the cable glands and the terminal
block).
R
emote control connection
The connection and disconnection of the inverter to and from the grid can
EHFRQWUROOHGWKURXJKDQH[WHUQDOFRQWUROVHHWKHVSHFL¿FSDUDJUDSKRQ
chapter 7).
The function must be enabled via web server user interface. If the remote
control function is disabled, the switching on of the inverter is dictated by
the presence of the normal parameters that allow the inverter to connect
to the grid.
If the remote control function is on, besides being dictated by the
presence of the normal parameters that allow the inverter to connect
to the grid, switching on the inverter also depends on the state of REM
terminals (terminal 2 and terminal 4) on the communication and control
signal terminal block
40
.
When terminal 2 is brought to the same potential as terminal 4 (i.e.
positioning a switch to create a short circuit between the two terminals),
the inverter is disconnected from the grid.
The connection and disconnection of the inverter to and from the grid can
be controlled through an external control.
Since this is a digital input, there are no requirements to be observed
as regards cable cross-section (it only needs to comply with the sizing
requirement for passing cables through the cable glands and the terminal
block).
+T/R RS485 METER
BKP
BKP
+5V
-T/R RS485 METER
RTN RS485 METER
+T/R RS485 L
OGGER
-T/R RS485 L
OGGER
RTN RS485 L
OGGER
N.C. OUTPUT 1
C OUTPUT 1
N.O
. OUTPUT 1
N.C. OUTPUT 2
C OUTPUT 2
N.O
. OUTPUT 2
+T/R RS485 PC
REM
REM
+5V
-T/R RS485 PC
RTN RS485 PC
+T/R RS485 L
OGGER
-T/R RS485 L
OGGER
RTN RS485 L
OGGER
40
+T/R RS485 METER
BKP
BKP
+5V
-T/R RS485 METER
RTN RS485 METER
+T/R RS485 L
OGGER
-T/R RS485 L
OGGER
RTN RS485 L
OGGER
N.C. OUTPUT 1
C OUTPUT 1
N.O
. OUTPUT 1
N.C. OUTPUT 2
C OUTPUT 2
N.O
. OUTPUT 2
+T/R RS485 PC
REM
REM
+5V
-T/R RS485 PC
RTN RS485 PC
+T/R RS485 L
OGGER
-T/R RS485 L
OGGER
RTN RS485 L
OGGER
40
Содержание REACT 2 Series
Страница 1: ...ABB solar inverters Product manual REACT 2 3 6 to 5 0 kW ...
Страница 159: ...Contact us www abb com solarinverters ...