![ABB REACT 2 Series Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/abb/react-2-series/react-2-series_product-manual_4161066.webp)
- 66 -
000897AG
5 - Installation
The underlying procedure is related to the side-by-side installation of REACT2-BATT. Alternatively,
LVSRVVLEOHWRLQVWDOOWKH5($&7%$77VHSDUDWHO\DQGDWJUHDWHUGLVWDQFHVXVLQJWKH³5($&7;/
CABLE-KIT” cable kit (2 meter cables length).
3RVLWLRQ WKH 5($&7%$77 EUDFNHW
20
of the second REACT2-BATT so
that it is perfectly level on the wall and
use it as a drilling template. To aling
the brackets of the two REACT2-
BATT (in case of side-by-side
installation) use the reference point
and follow the steps as in the picture.
,W LV WKH LQVWDOOHU¶V UHVSRQVLELOLW\
to choose an appropriate type of
screw anchors for the attachment
points. The choice must be based
on the type of support (wall, frame or
other support), the type of anchors
to be used, and their ability to
support 4 times the inverter’s weight
(4x50Kg=200Kg).
)L[WKH5($&7%$77EUDFNHW
20
to
the support.
Lift the REACT2-BATT up to the
bracket and insert the heads of
two anchor points (present on
the back of the battery unit) into
the slots
on the bracket
20
.
Risk of injury due to
the heavy weight of
the equipment.
Hang up the lower part of the REACT2-BATT
to the wall using the two anchor points
26
(holes diameter 11 mm).
M
ounting instruction - REACT2 multi battery system
21
02
20
B
B
2 x
Ø
9 mm
STEP 1
STEP 2
Содержание REACT 2 Series
Страница 1: ...ABB solar inverters Product manual REACT 2 3 6 to 5 0 kW ...
Страница 159: ...Contact us www abb com solarinverters ...