
14
EN
(Continue to next page)
—
Mounting Instruction
The inverter must be corrrectly installed, in a suitable location, to operate properly and safely.
Installers must know and understand applicable NEC requirements and any local codes for photovoltaic systems.
Installers must know and understand OSHA and other applicable safety requirements, including lockout/tagout
procedures.
Remember that when the photovoltaic panels are exposed to sunlight they provide continuous DC voltage to the
inverter. Before installation may begin, photovoltaic panels must be shaded or isolated.
Before installation may begin, the inverter must be disconnected from the grid (power disconnect switch open and
external AC disconnect locked out/tagged out).
Limit installation to licensed electricians experienced in PV plant wiring.
Obtain approval of the local AHJ before connecting the inverter to the electrical grid.
The equipment owner must post the PPE level (per NFPA TDE-2012, Table 13)
MOUNTING WITH A SUPPORT BRACKET
• Assembly the two side bracket pieces together with the cen-
tral bracket, by sliding it as shown in the picture and paying at-
tention to the orientation of the pieces (refer to arrow and
“UP” markings on the brackets): side brackets arrow have to be
turned downwards, central bracket have to be turned up-
wards.
• Slide the central bracket in order to match the two holes with
the centerning pins of the side brackets.