8
EN
Lifting
Risk of injury due to the heavy weight of the equipment!
ABB usually stores and protects individual components by suitable means to make their transport and subsequent handling easier.
Nonetheless, as a rule, it is necessary to turn to the experience of specialised staff to take charge of loading and unloading components.
The power module and the wiring box must be lifted using the 4 handles
(04)
(to be ordered) or alternatively using suitable lifting
equipment.
The means used for lifting must be suitable to bear the weight of the equipment.
In case of manual lifting the number of required operators necessary to lift the equipment must be in accordance
to local regulations relating lifting limits per operator
The handles
(04)
must be mounted into the designated holes located on the enclosures.
If lifting with ropes, M8 eyebolts can be mounted in the same holes.
Handling and installation operations shall be performed only by using the special tools and accessories provided
with “PVS-175 INSTALLATION KIT” that have to be ordered separately. The use of these equipment are mandatory
to safely install the inverter. Refer to “Kit of recommended spare parts” chapter content in the product manual for
further information.
DO NOT grab the equipment from the rear flange!
Risk of injury due to cutting surfaces and risk of equipment da-
mange. Always use proper lifting equipment!
It is required to use one of the following lifting methods to move the equipment during installation or maintenance phases:
Manual lifting (handles)
Vertical lifting
(eyebolts and lifting balancer)
M8. Kit of handles
(04)
(to be ordered)
M8. Hole for Eyebolts UNI2947 (not supplied) *lifting balancer must
be 20 cm / 8" longer (per side) than the lifted device.