5 - Installation
Interface connectors connection
Last operation before proceed with the wiring and connections of AC and
DC sources is to connect the interface connectors that allow the power
and the communication connection between the power module
01
and
the wiring box
02
:
Connection of the AC interface cables:
• Connect the R, S, T cables coming from the wiring box to the respec-
tive anchor points R, S, T in the AC interconnection board
58
using
the screws supplied with the power module component kit (tightening
torque 4Nm).
• Connect the earth cable to the dedicated point next to the AC inter-
connection board
58
(see the picture) using the M5 nut and the two
serrated lock washers supplied with the power module component kit
(tightening torque 2Nm).
C3
MP7
MP5
MP3
MP9
C2
MP2
MP1
MP8
C1
MP4
MP6
ZGN.V2Q33.1
Pb-free
T
R S
A
B
Connection of the DC interface cables:
• Connect the 6 connectors coming from the wiring box in the dedicated
connectors of the DC interconnection board