![ABB NMBP-01 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/abb/nmbp-01/nmbp-01_installation-and-startup-manual_2754017.webp)
Installation and Start-up Guide for NMBP-01
4-1
Chapter 4 – Electrical Installation
This chapter gives wiring instructions for wiring the NMBP-01 Modbus Plus
option module to 24 VDC power, fibre link connection to the drive, and to the
Modbus Plus network.
WARNING! Verify that the ACS 600 is not powered before starting the
installation.
NMBP-01 Connectors
The NMBP-01 module has multiple connectors on its front plate. These are
shown in Figure 4-1 below.
Figure 4-1 NMBP-01 Front Connections.
Modbus Plus
Fibre link, Receive
Fibre link, Transmit
Reset Button
LED, Status
LED, MBP
LED, Power
LED, DDCS
24 V d.c.
Earth
0 V d.c.
X2
V3
V4
X1 X1:2
X1:1
X1:3
Содержание NMBP-01
Страница 1: ...ACS 600 Installation and Start up Guide Modbus Plus Adapter Module NMBP 01 ...
Страница 2: ......
Страница 4: ...ii Installation and Start up Guide for NMBP 01 ...
Страница 66: ......