3 Maintenance
3.2.2. Maintenance schedule
111
3HAC026876-001 Revision: C
© Copyri
ght
200
6-2008 ABB.
All rights reserved.
•
1)
If the robot is run at ambient temperatures higher than 50°C, the equipment may
require maintenance more frequently.
•
2)
The service time for gearboxes, axes 4 and 5, is not calculated by the SIS, see
expected life in section
Expected component life on page 114
•
3)
Replace when damage is detected or when approaching life limit as specified in
Expected component life on page 114
•
4)
The interval is the same as the interval for changing axis 2 gear oil because of the
similarity of the type and degree of operation. Always lubricate the front eye bearing
after refitting the balancing device shaft!
•
5)
It is recommended to replace the complete upper arm house, instead of only
replacing the gearbox.
•
6)
It is recommended to replace the complete wrist unit, instead of only replacing the
gearbox.
•
9)
"24 000 h" = 6000 h + 18000 h.
Activities and intervals, optional equipment
The table below specifies the required maintenance activities and intervals for common
optional equipment. Maintenance of other external equipment for the robot is detailed in
separate documentation.
Activities and intervals, Foundry Prime
The table below specifies the required maintenance activities and intervals for Foundry
Prime.
Maintenance
activity
Equipment
Interval
Detailed in section
Inspection
Signal lamp
Inspection, signal lamp
(option) on page 148
Inspection
Mechanical stop axes 1-2-3
12 mths
Inspection, additional
mechanical stops on page
144
Maintenance
activity
Equipment
Interval
Detailed in section
Inspection
Replacement
Cable harness
6 mths
If required
6)
Inspection, cable harness on
page 133
Replacement of cable harness,
axes 1-6 on page 193
Inspection
Air hoses
6 mths
Inspection of air hoses (Foundry
Prime) on page 138
Inspection
Balancing device
12 mths
Inspection, balancing device on
page 128
Inspection
Information labels
12 mths
Inspection, information labels
on page 139
Inspection
Damper axes 2-5
12 mths
Inspection, damper axes 2-5 on
page 146
Inspection
Mechanical stop, axis 1
12 mths
Inspection, mechanical stop,
axis 1 on page 142
Continued
Continues on next page
Содержание IRB 6640 - 130/3.2
Страница 2: ......
Страница 14: ...How to read the product manual 3HAC026876 001 Revision C 12 Copyright 2006 2008 ABB All rights reserved ...
Страница 439: ......
Страница 442: ......
Страница 443: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 Telefax 46 0 21 132592 3HAC026876 001 Revision C en ...