4 Repair
4.3.6. Replacement of complete arm system
3HAC026876-001 Revision: C
236
© Copyri
ght
200
6-2008 ABB.
All rights reserved.
4. Loosen the cable connectors from the
base and pull up the cabling from the
base, through the hole in the center of the
frame.
.
harness, Cleanroom on page 207
.
5. Remove the motor, axis 1.
.
6. Run the overhead crane to a position
above the robot.
7. Fit the lifting device and adjust it as
detailed in the enclosed instructions.
Also fit a hoisting block to the roundsling
put around the lower arm. Used to adjust
the balance of the arm system in order to
lift it completely level.
Art. no. is specified in
.
Make sure the lift is done completely level!
How to adjust the lift is described in the
enclosed instruction to the lifting device!
Read the instructions before lifting!
xx0700000349
•
A: Lifting eye (on armhouse)
•
B: Lifting chain
•
C: Hoisting block
•
D: Lifting chain
•
E: Lifting chain
•
F: Roundsling (put in a loop around
the wrist on the inside)
•
G: Roundsling (used to eliminate any
load through the brake on motor axis
3)
•
H: Position for roundsling G, put
behind the mechanical stop pin.
•
J: Roundsling (put in a loop around the
lower arm)
Action
Note
Continued
Continues on next page
Содержание IRB 6640 - 130/3.2
Страница 2: ......
Страница 14: ...How to read the product manual 3HAC026876 001 Revision C 12 Copyright 2006 2008 ABB All rights reserved ...
Страница 439: ......
Страница 442: ......
Страница 443: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 Telefax 46 0 21 132592 3HAC026876 001 Revision C en ...