Note
Action
Use a crane!
Make sure the weight of the upper arm is
properly secured.
2
Shown in the figure
Fit the new
spherical roller bearings
to the
tie rod using the
press tool, parallel bar
bearing
. Lubricate the bearings with bearing
grease.
3
Art. no. is specified in
Shown in the figure
Fit new
bearing sealings
to the shaft ends
and lubricate the shaft ends with grease.
4
Spare part no. is specified in
Art. no. is specified in
Refit the tie rod, using the
mounting tool,
parallel bar
.
Note
Press by hand!
5
Fit new bearing sealings to the bearings.
6
Shown in the figure
Refit the back up ring.
7
Shown in the figure
Refit the locking washer.
8
M8 x 16.
Refit the
attachment screw
at both ends of
the bar, using
locking liquid
.
9
Loctite 243
Shown in the figure
Calibration is detailed in a separate calib-
ration manual enclosed with the calibra-
tion tools.
Recalibrate the robot!
10
General calibration information is in-
cluded in the section
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on page 29
.
11
152
Product manual - IRB 2400
3HAC022031-001 Revision: P
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.5.2 Replacement of tie rod
Continued
Содержание IRB 2400 Series
Страница 1: ...ROBOTICS Product manual IRB 2400 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 204: ...This page is intentionally left blank ...
Страница 220: ...This page is intentionally left blank ...
Страница 232: ...This page is intentionally left blank ...
Страница 234: ...This page is intentionally left blank ...
Страница 240: ......
Страница 241: ......