![ABB IRB 2400 Series Скачать руководство пользователя страница 129](http://html.mh-extra.com/html/abb/irb-2400-series/irb-2400-series_product-manual_5033129.webp)
Note/Illustration
Action
xx0200000405
Remove the upper bracket securing the
cables to the arm house by unscrewing its
two attachment screws (C).
Cut the strip clamp (B).
10
Remove the back cover of the motors 4-6,
fitted with torx screw.
11
xx0200000406
Disconnect all connectors at motor 4, 5 and
motor 6, R3.MP4-6 and R3.FB4-6:
A - R3.MP5
B - R3.MP6
C - R3.MP4
D - R3.FB5
E - R3.FB6
F - R3.FB4
12
Remove all screws holding the motor case
on motor 4-6.
13
Gently pull the cable harness out.
14
Refitting, cable harness, axes 4-6
The procedure below details how to refit the cable harness, axes 4-6.
Note/Illustration
Action
DANGER
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the ro-
bot!
1
Continues on next page
Product manual - IRB 2400
129
3HAC022031-001 Revision: P
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.3.2 Replacement of cable harness, axes 4-6
Continued
Содержание IRB 2400 Series
Страница 1: ...ROBOTICS Product manual IRB 2400 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 204: ...This page is intentionally left blank ...
Страница 220: ...This page is intentionally left blank ...
Страница 232: ...This page is intentionally left blank ...
Страница 234: ...This page is intentionally left blank ...
Страница 240: ......
Страница 241: ......