![ABB Integritas Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/abb/integritas/integritas_quick-start-manual_4116003012.webp)
QUICK START GUIDE
Page 12
Version 6.0
© 2021 ABB. All rights reserved.
Step 5
-
Connect Loads (equipment to be powered)
Load voltage is marked on the charger ratings label.
Load connections are to the terminal blocks in the DC Output Box.
Load terminal block (TB) is behind the Battery terminal block.
Each TB position is marked with its connection: BAT1+, BAT1
-
, BAT2+, BAT2
-
, 125V DC+, 125V DC
-
, 24VDC+, 24VDC
-
, 48VDC+, 48VDC
-
.
1.
Verify that equipment being powered accepts the charger output voltage.
2.
Verify all DC breakers (DC1, DC2) are OFF.
3.
Remove the DC Output Box cover
-
4 thumbscrews.
4.
Connect Load 1 Positive cable to the Positive terminal block position marked Load 1.
5.
Connect Load 1 Negative cable to the Negative terminal block position behind the positive position marked
Load 1.
6.
If DC2 Breaker is labeled
“
Load
”,
Repeat from 4. for Load 2.
7.
Replace the DC Output Box cover
-
4 thumbscrews.
Top Feed
with 1 DC Load breaker
Bottom Feed
with 2 DC Load breakers
(Shown as 125VDC)
Battery TB
Screws
Load TB
Behind
Battery TB
Screws
LOAD1+
LOAD1–
Battery TB
BAT
2
+