8
Start-up and acceptance test
Contents of this chapter
This chapter describes the start-up, acceptance test procedure, and
validation of the safety function.
Validation of the safety functions
You must do an acceptance test (validation) to validate the correct
operation of safety functions.
■
Competence
The acceptance test of the safety function must be carried out by a
competent person with expertise and knowledge of the safety function
as well as functional safety, as required by IEC 61508-1 clause 6,
and ATEX/Ex regulations. The test procedures and report must be
documented and signed by this person.
Start-up and acceptance test 65
Содержание FPTC-02
Страница 2: ......
Страница 4: ......
Страница 23: ... Layout 1 1 2 4 3 XSTO2 XSTO1 XWRN XFLT Retaining clips 1 Lock 2 Hardware description 23 ...
Страница 28: ...28 ...
Страница 37: ...2 3 1 4 Mechanical installation 37 ...
Страница 38: ...38 ...
Страница 48: ...48 ...
Страница 64: ...64 ...
Страница 70: ...70 ...
Страница 78: ...78 ...
Страница 89: ...Technical data 89 ...
Страница 90: ...90 Technical data ...
Страница 92: ...92 Technical data ...
Страница 93: ...Check the latest version of the certificate in the ABB Library Technical data 93 ...