![ABB FPTC-02 Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/abb/fptc-02/fptc-02_user-manual_2723035.webp)
5
Mechanical installation
Contents of this chapter
This chapter contains a delivery checklist and instructions on installing
the module.
Necessary tools and instructions
•
Torx screwdriver (T10)
For a complete list of tools, see the applicable drive hardware manual.
Unpacking and examining the delivery
1. Open the option package.
2. Make sure that the package contains:
•
FPTC-02 module
•
STO cable
•
ATEX label (with the ATEX classification markings)
•
this manual.
3. Make sure that there are no signs of damage to any of the items.
Mechanical installation 35
Содержание FPTC-02
Страница 2: ......
Страница 4: ......
Страница 23: ... Layout 1 1 2 4 3 XSTO2 XSTO1 XWRN XFLT Retaining clips 1 Lock 2 Hardware description 23 ...
Страница 28: ...28 ...
Страница 37: ...2 3 1 4 Mechanical installation 37 ...
Страница 38: ...38 ...
Страница 48: ...48 ...
Страница 64: ...64 ...
Страница 70: ...70 ...
Страница 78: ...78 ...
Страница 89: ...Technical data 89 ...
Страница 90: ...90 Technical data ...
Страница 92: ...92 Technical data ...
Страница 93: ...Check the latest version of the certificate in the ABB Library Technical data 93 ...