Page 93
© Copyright 2021 ABB. All rights reserved.
System Info:
Various high level system statuses.
Controller Info
Provides the versions of software for the overall controller (QS840A_MC1), boot block of the
controller, display, and the defaults.
Date
System controller present date using configured format.
Time
System controller present time using configured format.
Ambient Temperature
System controller present temperature using configured format.
Control/Operations
The following are the system control and operation functions that can be performed from the front
panel. These operations are generally used in post installation and maintenance modes.
Start Lamp Test
Temporarily illuminates all status indicators of attached rectifiers,
distribution monitoring and control modules and the system controller.
Restart Rectifiers
Restarts all system serial controlled rectifiers. Does not affect rectifiers, and other system
devices that are already functioning.
Clear Events
Used to clear momentary events or alarms. It clears the following system alarms: Check
Battery, Reserve Time Low, Battery Voltage Imbalance
Uninstall Equipment
Clears alarms related to the removal of a system component such
as a rectifier, thermal probe, or voltage monitoring module.
Alarm Test
Initiates the asserting the Form
-
C alarms.
Start Battery Test
Initiates the manual battery test feature. A stop battery test operation is displayed to
interrupt the testing and return the unit to normal operation. The manual battery test utilizes
the configured test duration and a system bus voltage threshold to represent the end of
reserve.
Start Boost
Initiates the manual battery Boost feature. A stop battery Boost operation is displayed to
interrupt the Boost operation mode and return the unit to normal operation.
Clear History:
This area of the menus system can be used to clear of Alarm, BD and Boost History logs.
Clear Statistics:
This operation allows the user to clear the Basic statistical data kept on Plant Load,
the highest battery temperature, and ambient controller temperature.
Disconnects:
Allows manual disconnect and reconnect of each of the four disconnects (LVBD, LVLD1
-
3).
Load Factory Defaults:
Initiating this operation loads all factory configured defaults back into the
controller.
History
This area of the menu system contains history information. The controller works on a first record in
first record out once the record size of a specific field is reached. The following system history logs are
available:
Alarm History
Chronological view of the last 30 alarms and events that have occurred since the last time the
history log was cleared.
BD History
Chronological view of the last 10 battery on discharge (BD) events since the last time the
history log was cleared.
Boost History
Chronological view of the last 10 times the system entered boost mode since the last time the
history log was cleared.
Содержание CPS6000
Страница 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 36: ...Page 36 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 98: ...Page 98 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 105: ...Page 105 Copyright 2021 ABB All rights reserved Figure 7 5 Configuration Menu part 1 Configuration Menu ...
Страница 106: ...Page 106 Copyright 2021 ABB All rights reserved Figure 7 6 Configuration Menu part 2 Configuration Menu continued ...
Страница 124: ...Page 124 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 146: ...Page 146 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 152: ...Page 152 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 174: ...Page 174 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 188: ...Page 188 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 196: ...Page 196 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 198: ...Page 198 Copyright 2021 ABB All rights reserved This page intentionally left blank ...