Page 77
© Copyright 2021 ABB. All rights reserved.
6
AC, Alarm, and Control Cable Reference Information
Overview
This section contains additional information (connector pin designations, etc.) that may be required
for making, customizing, or troubleshooting system connections.
AC Utility Connection
Note: Each ac connection to the CPS6000 shelf is to be provided with circuit breaker protection at
maximum 40A for a 23
-
inch shelf with dual ac feed and low
-
line (120V) input. For high
-
line (200
-
240V)
input, a 40A circuit breaker is adequate.
CAUTION: Ensure ac power is OFF to the CPS6000 system before continuing with ac utility
connection.
The 23
-
inch dual
-
feed shelf requires the H569
-
470 G50A ac cord, which consists of two sets and is
unterminated at the utility end. Insert these into the ac receptacles on the CPS6000 shelf. Terminate
the other end with an appropriate plug. Follow all safety rules provided with the plug when connecting
the plug to the cable assembly. Refer to the following table for ac feed polarity.
AC Voltage
120V
200 to 240V
Cable Color Code
Cable Color Code
Line 1
Line 1
Black
Brown
Neutral
Line 2 / Neutral
White
Blue
Ground
Ground
Green
Green / Yellow
Guide the utility end of the ac cords to the utility source. When routing cable, please ensure cable does
not traverse any sharp or rough surfaces that may over time cause its insulation to abrade. Also, please
be careful to route cables away from doors and the like to prevent any possible damage from pinching.
When connecting to utility source, ensure all local and national wiring rules are being complied with.
Controller Connections
Figure 6
-
1 shows the Controller connector locations.
J3 Isolated RS
-
232 port
P5 Auxiliary port Connector
J2 Shelf Paralleling Connector
J1 Office Alarm Connector
Содержание CPS6000
Страница 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 36: ...Page 36 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 98: ...Page 98 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 105: ...Page 105 Copyright 2021 ABB All rights reserved Figure 7 5 Configuration Menu part 1 Configuration Menu ...
Страница 106: ...Page 106 Copyright 2021 ABB All rights reserved Figure 7 6 Configuration Menu part 2 Configuration Menu continued ...
Страница 124: ...Page 124 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 146: ...Page 146 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 152: ...Page 152 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 174: ...Page 174 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 188: ...Page 188 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 196: ...Page 196 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 198: ...Page 198 Copyright 2021 ABB All rights reserved This page intentionally left blank ...