4.3.5
Installation Checklist
All packing materials and restraints have been removed from each cabinet.
Each cabinet in the UPS system is placed in the installed location.
All conduits and cables are properly routed to the UPS and auxiliary cabinets.
All power cables are properly sized and terminated.
A ground conductor is properly installed.
If the cabinet does not use all module mounting locations, the provided protective
covers are installed on the front and back of the cabinet.
Battery cabinet installation instructions have been completed.
Air conditioning equipment is installed and operating properly.
The area around the installed UPS system is clean and dust-free. (It is recommended
that the UPS be installed on a level floor suitable for computer or electronic equipment.
Adequate workspace exists around the UPS and other cabinets.
Adequate lighting is provided around all UPS equipment.
Any optional accessories are mounted in their installed location and properly wired.
Summary alarms and/or building alarms are wired appropriately. (OPTIONAL)
Startup and operational checks performed by certified service personnel.
Содержание Conceptpower DPA 500
Страница 1: ... Copyright 2017 ABB All rights reserved Operating manual Conceptpower DPA 500 100 500 kW ...
Страница 2: ......
Страница 79: ... Copyright 2017 ABB All rights reserved Appendix A Xtra VFI 3 ph UPS products ...
Страница 88: ...Modifications reserved Page 88 94 Attachments Technical data sheet ...
Страница 90: ......
Страница 91: ... Copyright 2017 ABB All rights reserved Technical data sheet Conceptpower DPA 500 100 500 kW ...