About this manual
15
Installation and commissioning flowchart
Task
See
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
(page
Planning the electrical installation
(page
(page
Option manual (if optional equipment is
included)
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
:
(page
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
more information.
Check the installation site.
(page
(page
If the drive is about to be connected to an IT
(ungrounded) or corner-grounded system, check that
the internal EMC filtering of the drive has been
disconnected.
:
(page
Install the drive in a cabinet.
:
(page
Route the cables.
Planning the electrical installation
(page
Check the insulation of the supply cable, the motor
and the motor cable, and the resistor cable (if
present).
(page
Содержание ACSM1-04 Series
Страница 1: ...ACSM1 Hardware Manual ACSM1 04 Drive Modules 55 to 110 kW ...
Страница 2: ......
Страница 4: ......
Страница 18: ...About this manual 18 ...
Страница 22: ...The ACSM1 04 22 ...
Страница 64: ...Electrical installation 64 ...
Страница 70: ...Maintenance 70 ...
Страница 82: ...Technical data 82 ...
Страница 88: ...Dimension drawings 88 Drive module ...
Страница 89: ...Dimension drawings 89 Drive module continued from previous page ...
Страница 91: ......