07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
92/184
7.5.1.5
Preparing cables for cable entries with sealing modules
As a standard, the cabinet is delivered for cable entry through the roof of the terminal
compartment. If cables are entered through the floor, swap entry plate and cover plate.
- Prepare cables with an outer cable screen or shield for EMC bonding with the metal
enclosure of the cabinet as illustrated in Fig. 7-7.
Figure 7-7: Preparing power cables for sealing modules
- Install the sealing modules according to the instructions of the sealing module supplier.
(1) Sealing module
(2) Frame
(3) Conductive foil of sealing module
(4) Cable clamp
(5) Shrinkable sheath seal
(6) Heat-shrinkable termination
(7) Outer cable sheath
(8) Cable sheath removed to expose cable shield
(9) Shield extension to be connected to PG busbar
(10)Screen extension to be connected to the
PG busbar
(11)Cable lug as specified by the cable supplier and
suitable for M12 bolt
1
2
3
4
5
6
7
8
9
10
11
Содержание ACS 1013-A1
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Страница 3: ...Contents ACS1000 air cooled User manual ...
Страница 5: ... 01 About this manual 01 3 14 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 15 26 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 27 50 ...
Страница 53: ... 04 Control system 04 51 66 ...
Страница 68: ......
Страница 69: ... 05 Transportation storage and disposal05 67 74 ...
Страница 76: ......
Страница 77: ... 06 Mechanical installation 06 75 82 ...
Страница 84: ......
Страница 85: ... 07 Electrical installation07 83 106 ...
Страница 108: ......
Страница 109: ... 08 Commissioning 08 107 112 ...
Страница 115: ... 09 Operation 09 113 126 ...
Страница 129: ... 10 CDP control panel 10 127 150 ...
Страница 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Страница 185: ......