07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
89/184
7.5
Power cables, ground cables and equipotential
bonding conductor
7.5.1
Preparing the cable entry and the cables
NOTICE
7.5.1.1
Maximum number of cables per phase
The maximum number of cables that can be used per phase depends on the type of the drive
and its nominal voltage.
Table 7-1: Maximum number of cables per phase
7.5.1.2
Determining the cable length
1. Determine the required length of a cable between the point of entry and the connection
point inside the cabinet.
2. Cut the cable to the required length before connection.
See layout drawing in “Appendix C – Mechanical drawings” for information on:
- Project-specific cable entry
- Distance between point of cable entry and terminals
- Busbar and fastening hole dimensions
- Busbar designations
See “Appendix D – Wiring diagrams” for information on:
- Conventions for cross-reference and device identification
Risk of damage or malfunction!
- Waste inside the cabinet can cause damage or malfunction.
- If possible, do not cut cables inside the terminal compartment.
- Retrieve any waste which accidentally dropped into the cabinet.
ACS1000 type
2.3 kV nominal voltage
3.3 kV nominal voltage
4.0 kV nominal voltage
A1
1 cable per phase
1 cable per phase
1 cable per phase
A2
2 cables per phase
1 cable per phase
1 cable per phase
A3
2 cables per phase
2 cables per phase
1 cable per phase
Содержание ACS 1013-A1
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Страница 3: ...Contents ACS1000 air cooled User manual ...
Страница 5: ... 01 About this manual 01 3 14 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 15 26 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 27 50 ...
Страница 53: ... 04 Control system 04 51 66 ...
Страница 68: ......
Страница 69: ... 05 Transportation storage and disposal05 67 74 ...
Страница 76: ......
Страница 77: ... 06 Mechanical installation 06 75 82 ...
Страница 84: ......
Страница 85: ... 07 Electrical installation07 83 106 ...
Страница 108: ......
Страница 109: ... 08 Commissioning 08 107 112 ...
Страница 115: ... 09 Operation 09 113 126 ...
Страница 129: ... 10 CDP control panel 10 127 150 ...
Страница 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Страница 185: ......