04 CONTROL SYSTEM
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
57/184
Other general control, protection and monitoring tasks regarding the whole drive include
control and monitoring of:
- “2.8 Important note - main circuit breaker” on page 23
- “3.4.4 Grounding switch” on page 37
- “3.5 Cooling system” on page 42
4.2.2.2
Parameters
The control system is configured, customized, and tuned with a set of application parameters.
The application parameters are organized in functional groups and have factory-set default
values. The default parameter values are adjusted during commissioning to the specific
application of the drive in order to activate the specific control, monitoring and protection
functions for the driven process, and to define the signals and data transferred between drive
and external equipment.
4.2.2.3
Main circuit breaker
The main circuit breaker (MCB) is an important switching and protection device of the drive
system. Therefore it must only be controlled and monitored by the drive.
For more information on the parameters for signal allocation, signal type selection,
signal inversion, scaling, and filtering, see Appendix G – Signal and parameter table.
For more information, see:
- Main circuit breaker engineering guideline
Содержание ACS 1013-A1
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Страница 3: ...Contents ACS1000 air cooled User manual ...
Страница 5: ... 01 About this manual 01 3 14 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 15 26 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 27 50 ...
Страница 53: ... 04 Control system 04 51 66 ...
Страница 68: ......
Страница 69: ... 05 Transportation storage and disposal05 67 74 ...
Страница 76: ......
Страница 77: ... 06 Mechanical installation 06 75 82 ...
Страница 84: ......
Страница 85: ... 07 Electrical installation07 83 106 ...
Страница 108: ......
Страница 109: ... 08 Commissioning 08 107 112 ...
Страница 115: ... 09 Operation 09 113 126 ...
Страница 129: ... 10 CDP control panel 10 127 150 ...
Страница 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Страница 185: ......