Operation Manual / A170-M.. - A175-M..
4 Commissioning / 4.3 Commissioning after taking out of operation
© Copyright 2021 ABB. All rights reserved.
HZTL4033_EN
Rev.H
July 2021
4.2.4
Checks when starting up the engine
u
Measure speed, oil pressure and charging pressure at various engine performances.
u
Measure the exhaust gas temperature before and after the turbine.
u
Measure the air temperature before and after the compressor.
u
Compare the measured values with the values of the acceptance report. Different operat-
ing conditions indicate a malfunction (see Chapter
Escape of oily fluids
Lubricants and pastes used during assembly can liquefy or vaporise and escape as oily fluids
during the initial hours of operation. Continual escape of an oily fluid indicates an oil leak.
u
If there is a leak, contact an ABB Turbocharging Service Station.
4.3
Commissioning after taking out of operation
If present
u
Remove cover plates (blind flanges) from the compressor casing, the gas inlet and the
gas outlet.
General
u
Check the exhaust gas pipe before and after the turbine for combustion residues or wa-
ter residues and clean it. Remove any foreign objects that may be present.
u
Check and clean filter silencer or air supply line, and remove any foreign objects that may
be present.
u
Put engine-side oil circulation to the turbocharger into operation.
u
Prepare the turbocharger for operation (see
u
The turbocharger is now ready for operation.
Page
40
/
147
Содержание A170-M62
Страница 2: ......
Страница 145: ...Operation Manual A170 M A175 M 14 Tools Copyright 2021 ABB All rights reserved HZTL4033_EN Rev H July 2021 Page 143 147 ...
Страница 150: ......