Operation Manual / A170-M.. - A175-M..
9 Disassembly and assembly / 9.14 Removing and installing turbine-
end nozzle ring
© Copyright 2021 ABB. All rights reserved.
HZTL4033_EN
Rev.H
July 2021
Product
Size
Tightening torque [Nm]
A170-M
M10
50
A175-M
M10
50
Table 52: Tightening torque (56014)
Product
Size
Tightening torque [Nm]
Stage 1
Stage 2
Stage 3
A170-M
M18
80
170
280
A175-M
M20
100
240
380
Table 53: Tightening torque (61009)
1. Coat threads of new screws (56014) with high-temperature grease.
Fit the nozzle ring (56001) to the gas inlet casing (51001) using the screws (56014) and
new locking washers (56015).
Bend over locking washers.
2. Fix new spiral-wound gasket (61050) in groove of gas outlet casing (61001) at three
evenly distributed points with a little superglue (such as Loctite® 454).
3. Fit two guide studs (90321) in the upper part of the gas outlet casing (61001).
4. Coat threads of screws (61009) with high-temperature grease.
5. Loop around gas inlet casing (51001) and, using lifting gear, slide over guide studs until
at the gas outlet casing (61001) and secure with screws (61009).
6. Remove the guide studs (90321).
7. Fit remaining screws (61009), then crosswise tighten all screws (61009). Observe tight-
ening torque.
8. If present: Fit connecting pipe for turbine cleaning
u
Refit dismantled insulation.
Page
115
/
147
Содержание A170-M62
Страница 2: ......
Страница 145: ...Operation Manual A170 M A175 M 14 Tools Copyright 2021 ABB All rights reserved HZTL4033_EN Rev H July 2021 Page 143 147 ...
Страница 150: ......