![background image](http://html1.mh-extra.com/html/abb/650-series/650-series_engineering-manual_3346622007.webp)
Table of contents
Section 1 Introduction.......................................................................5
This manual........................................................................................5
Intended audience..............................................................................5
Product documentation.......................................................................6
Product documentation set............................................................6
Document revision history.............................................................7
Related documents........................................................................7
Symbols and conventions...................................................................8
Symbols.........................................................................................8
Document conventions..................................................................8
Functions included in 650 series IEDs..........................................9
Section 2 Engineering tool set........................................................15
Introduction.......................................................................................15
IED engineering process..................................................................16
Section 3 Engineering process.......................................................19
Section 4 Setting up a project........................................................23
PCM600 operates on projects..........................................................23
Installing Connectivity packages......................................................23
Setting technical key.........................................................................24
Setting up communication between PCM600 and the IED...............26
Project managing in PCM600...........................................................31
Building a plant structure..................................................................32
IEC 61850 naming conventions to identify an IED......................34
Inserting an IED................................................................................35
Setting IED IP address in the project...........................................46
Section 5 Protection and control engineering................................49
Creating an application configuration with ACT................................49
Overview......................................................................................49
Function blocks............................................................................50
Signals and signal management.................................................52
Function block execution parameters..........................................52
Configuration parameters............................................................55
Connections and variables..........................................................55
Hardware channels......................................................................56
Validation.....................................................................................57
Table of contents
650 series
1
Engineering Manual