Note
Action
Secure the weight of the robot with round-
slings and lift it carefully up from the pallets.
17
Refit the robot to the foundation with its bolts.
18
See
Replacing the cable harness - lower
Refit the cable harness in frame and base.
19
Refit the base cover with its attachment
screws.
20
See
Performing a leak-down test on
.
Perform a leak-down test!
21
See
Filling oil, axis 1 gearbox on page 112
Fill axis 1 gearbox with oil.
22
Calibration is described in a separate
calibration manual enclosed with the cal-
ibration tools.
Recalibrate the robot.
23
General calibration information is included
in section
.
DANGER
Make sure all safety requirements are met
when performing the first test run.
24
Product manual - IRB 1520
213
3HAC043435-001 Revision: L
© Copyright 2012-2020 ABB. All rights reserved.
4 Repair
4.5.1 Replacing the base
Continued
Содержание IRB 1520
Страница 1: ...ROBOTICS Product manual IRB 1520 ...
Страница 2: ...Trace back information Workspace 20B version a12 Checked in 2020 05 28 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 74: ...This page is intentionally left blank ...
Страница 132: ...This page is intentionally left blank ...
Страница 288: ...This page is intentionally left blank ...
Страница 300: ...This page is intentionally left blank ...
Страница 302: ...This page is intentionally left blank ...
Страница 308: ......
Страница 309: ......