Step 2 - Updating the revolution counter with the FlexPendant
Use this procedure to update the revolution counter with the FlexPendant (IRC5).
Action
On the
ABB
menu, tap
Calibration
.
xx1500000942
1
All mechanical units connected to the system are shown with their calibration status.
2
Tap the mechanical unit in question.
xx1500000943
Continues on next page
280
Product manual - IRB 1520
3HAC043435-001 Revision: L
© Copyright 2012-2020 ABB. All rights reserved.
5 Calibration information
5.5 Updating revolution counters
Continued
Содержание IRB 1520
Страница 1: ...ROBOTICS Product manual IRB 1520 ...
Страница 2: ...Trace back information Workspace 20B version a12 Checked in 2020 05 28 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 74: ...This page is intentionally left blank ...
Страница 132: ...This page is intentionally left blank ...
Страница 288: ...This page is intentionally left blank ...
Страница 300: ...This page is intentionally left blank ...
Страница 302: ...This page is intentionally left blank ...
Страница 308: ......
Страница 309: ......