6
Installation, Operation and Parts Manual
AutoLift AL-6214
1. Secure the extension post column firmly to the top of the post. This is only necessary when your hoist is ordered with extension
posts.
2. Unfold the package and decide on which post the power unit will be mounted.
3. Refer to
Annex 2
and
Annex 3
to ascertain and measure the distance of the two posts with chalk and string line.
Step 5: Erect and secure first post, power side post (the post on which the control box and pump assembly will be
mounted) first and then the other post.
1. Using the base plate as a template, use a masonary drill to drill the holes.
2. Remove thoroughly the debris and dust in holes and ascertain that the posts stay right upon the circle previously marked by chalk.
3.
Secure the second post as per step, 1, 2.
NOTE: Torque all anchor bolts to 120 ft lbs.
Step 6: Install cross beam and top roof protection bumper.
Step 7: Connect steel wire ropes.
1. Route and fix according to the following diagram of steel wire rope connection.
2. Raise carriages on both sides approximately 800mm above the ground. Carriages must be at the same height from the floor.
3. Make sure that the mechanical safety locks on each post are fully engaged before attempting to route the wire ropes.
4. After the wire ropes are fixed, adjust the wire ropes on both sides to the same tension which could be judged by the
ratchet sound emits during lifting process. Make adjustments after trial run.
5.
Grease inside of each colum corners with GP grease.
THIS MUST BE DONE.
Step 8: Connect oil hoses.
1. Mount the power unit onto the power side post.
Содержание AL-6214A
Страница 15: ...14 Installation Operation and Parts Manual AutoLift AL 6214 Annex2 Overall diagram ...
Страница 16: ...15 Installation Operation and Parts Manual AutoLift AL 6214 Annex3 Floor plan ...
Страница 18: ...12 ...
Страница 19: ...12 Installation Operation and Parts Manual AutoLift AL 6214 Three phase ...
Страница 20: ...12 Installation Operation and Parts Manual AutoLift AL 6214 ...