9
Start
Press UP button to raise the carriage 5cm
Pull the release cable
Press the unloading handle
Installation, Operation and Parts Manual
AutoLift AL-6214
OPERATION INSTRUCTIONS
4.1
Precautions
4.1.1
Check all the joints of oil hose. Only when there is no leakage, the hoist can be operated.
4.1.2
DO NOT
use the hoist if the safety device malfunctions.
4.1.3
Make sure the vehicle is evenly balanced on the hoist. Otherwise, Advance
AutoQuip as well as our dealers will not bear any responsibility for any consequence resulted thereby.
4.1.4
Operators and other personnel should stand in a safe area during lifting and lowering process.
4.1.5
When the hoist is raised to the desired height, switch off the power at once to prevent any operation by other personnel.
4.1.6. Make sure the safety lock is engaged before working under the vehicle and no persons or objects are under the vehicle
during lifting and lowering process.
4.2 Flow chart for operation
PLEASE REFER TO OPERATIONS STICKER ON PAGE 26
Raising
Lowering
The hoist is raised
The hoist is lowered
Start
Press UP button
Содержание AL-6214A
Страница 15: ...14 Installation Operation and Parts Manual AutoLift AL 6214 Annex2 Overall diagram ...
Страница 16: ...15 Installation Operation and Parts Manual AutoLift AL 6214 Annex3 Floor plan ...
Страница 18: ...12 ...
Страница 19: ...12 Installation Operation and Parts Manual AutoLift AL 6214 Three phase ...
Страница 20: ...12 Installation Operation and Parts Manual AutoLift AL 6214 ...