Electric Heating Operation
When a call for heating (G and W1, W2,
etc.) is made the supply blower motors and
electric resistance heaters will energize.
Heating is accomplished by passing
electrical current through a specified amount
of resistance heaters which will produce the
required heat.
On a fault condition the main limit located
in the supply air or the auxiliary limit
located downstream the supply blower will
remove power from all contactors.
Steam or Hot Water Preheating and
Heating Operation
Valve control for steam and hot water
heating coils are by others. Heating is
accomplished by passing steam or hot water
through the steam or hot water coil
assembly.
Modulating Electric Preheat
Electric preheat is used to temper the
incoming outside air to the unit based on an
enable control signal and outside air
conditions. Electric preheat has a maximum
operation outside air temperature of 60°F
and a maximum preheat discharge air
temperature of 80°F.
Chilled Water or Non-Compressorized
DX Cooling Operation
Controls for chilled water cooling coils and
non-compressorized DX coil are by others.
Maintenance
(See back of the manual for maintenance
log)
At least once each year, a trained, qualified
service technician should check out the unit.
Fans, evaporator coils, and filters should be
inspected at least monthly.
Gas Heating
Make sure all gas supply lines have been
purged of air before turning on the electrical
power switch. Turn the gas valve to the on
position (see startup instructions). Turn the
main electrical power on and set the controls
to the heating mode of operation.
The combustion ventilation motor should
operate. The control will automatically
supply energy to the igniter and the gas
valve after the heating call is made.
The flame sensing probe detects the
presence of the flame. Should no flame be
detected in 10 seconds, the ignition system
will recycle. If no flame is detected after 3
tries, ignition system will lockout.
Remove the call for heating. The main gas
valves should be extinguished.
The supply fans are controlled by the
ignition system. In the fan “Auto” mode the
fan comes on 45 seconds after the flame is
Once a year, before the unit is in
operation for the heating season, a
qualified service technician should
inspect all flue product carrying areas
of the furnace and main burners for
continued safe operation.
WARNING
LEAK CHECK GAS PIPE
The gas pipe in the unit should be
checked for leaks before startup.
Leak checking is the responsibility of
the
installing
contractor.
All
connections should be checked for
leaks
annually
after
installation.
Failure to leak check could result in
fire, explosion, or other hazardous
situations.
DANGER
Содержание RQ SERIES
Страница 2: ......
Страница 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Страница 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Страница 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Страница 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Страница 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Страница 97: ......
Страница 98: ......
Страница 99: ......