
11
Some
chemical
coil
cleaning
compounds are caustic or toxic. Use
these substances only in accordance
with
the
manufacturer
’s
usage
instructions.
Failure
to
follow
instructions may result in equipment
damage, injury or death.
WARNING
Door
compartments
containing
hazardous voltage or rotating parts
are equipped with door latches to
allow locks. Door latch are shipped
with nut and bolts requiring tooled
access. If you do not replace the
shipping hardware with a pad lock
always re-install the nut & bolt after
closing the door.
CAUTION
Cleaning
the
cooling
tower
or
condenser water loop with harsh
chemicals such as hydrochloric acid
(muriatic acid), chlorine or other
chlorides,
can
damage
the
refrigerant-to-water heat exchanger.
Care should be taken to avoid
allowing chemicals to enter the
refrigerant-to-water heat exchanger.
See Appendix A - Heat Exchanger
Corrosion
Resistance
for
more
information.
CAUTION
OPEN LOOP APPLICATIONS
Failure of the condenser as a result
of chemical corrosion is excluded
from coverage under AAON Inc.
warranties and the heat exchanger
manufacturer’s warranties.
WARNING
WATER FREEZING
Failure of the condenser due to
freezing will allow water to enter the
refrigerant circuit and will cause
extensive damage to the refrigerant
circuit components. Any damage to
the equipment as a result of water
freezing in the condenser is excluded
from
coverage
under
AAON
warranties and the heat exchanger
manufacturer warranties.
WARNING
COMPRESSOR CYCLING
5 MINUTE MINIMUM OFF TIME
To
prevent
motor
overheating
compressors must cycle off for a
minimum of 5 minutes.
5 MINUTE MINIMUM ON TIME
To maintain the proper oil level
compressors must cycle on for a
minimum of 5 minutes.
The cycle rate must not exceed 6
starts per hour.
WARNING
Содержание RQ SERIES
Страница 2: ......
Страница 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Страница 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Страница 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Страница 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Страница 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Страница 97: ......
Страница 98: ......
Страница 99: ......