47
Condenser water pump must be field sized
and
installed
between
the
cooling
tower/geothermal loop and self-contained
unit. System should be sized in accordance
with
the
ASHRAE
Handbook.
Use
engineering guidelines to maintain equal
distances for supply and return piping and
limit bend radiuses to maintain balance in
the system. Balancing valves, permanent
thermometers and gauges may be required.
Before connection to the unit the condenser
water system should be flushed to remove
foreign material that could cause condenser
fouling. Install a screen strainer with a
minimum of 20 Mesh ahead of the
condenser inlet to prevent condenser fouling
and internal tube damage.
Mineral content of the condenser water must
be controlled. All make-up water has
minerals in it and as the water is evaporated
in the cooling tower, these minerals remain.
As the mineral content of the water
increases, the conductivity of the water
increases.
Field provided and installed water treatment
program must be compatible with stainless
steel, copper, aluminum, ABS plastic, and
PVC. Batch feed processes should never be
used as concentrated chemicals can cause
corrosion. Never use hydrochloric acid
(muriatic acid) or chlorine as it will corrode
stainless steel.
NOTE:
Ball valves should be installed in
the condenser water supply and return lines
for unit isolation and water flow balancing.
All manual flow valves should be of the ball
valve design. Globe or gate valves should
not be used due to high pressure drops and
poor throttling characteristics.
Pressure
and
temperature
ports
are
recommended in condenser water supply
and return lines for system balancing. These
openings should be 5 to 10 pipe diameters
from the unit water connections. To allow
PVC (Polyvinyl Chloride) and CPVC
(Chlorinated Polyvinyl Chloride) are
vulnerable to attack by certain
chemicals. Polyolester (POE) oils
used
with
R-410A
and
other
refrigerants, even in trace amounts,
in a PVC or CPVC piping system will
result in stress cracking of the piping
and fittings and complete piping
system failure.
CAUTION
WATER PIPING
Follow national and local codes when
installing water piping. Connections
to
the
unit
should
incorporate
vibration eliminators to reduce noise
and vibration and shutoff valves to
facilitate servicing. Supply and return
water piping must be at least as large
as the unit connections and larger
depending on length of runs, rise and
bends.
CAUTION
Each heat exchanger is equipped
with a refrigerant pressure relief
device to relieve pressure should
excessive
condensing
pressures
(>675 psig) occur. Codes may
require
installing
contractor
to
connect and route relief piping
outdoors.
The relief valve has a 5/8”
male flare outlet connection.
CAUTION
Содержание RQ SERIES
Страница 2: ......
Страница 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Страница 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Страница 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Страница 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Страница 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Страница 97: ......
Страница 98: ......
Страница 99: ......