25
PulsePak Prime
GDED-IOM-216-B
CAUTION: The edges of the explosion vent can be sharp.
CAUTION: Incorrect installation of the explosion vent can cause the panel to
not open at the rated burst pressure.
Place the explosion vent over the protruding bolt holes of the frame. Make
certain the dome is protruding outwards. Install the outlet frame.
Install bolts and nuts and tighten hand tight. Tighten nuts to 27–34 Newton
meters torque.
Typical Explosion Vent Installation.
To ensure proper installation of your explosion vent, carefully read the
separate manufacturer’s explosion vent installation guide.
WARNING: personal injury, death, and/or property damage can result from
material discharge during venting.
Содержание PulsePak Prime 10-2H
Страница 1: ...GDED IOM 216 B PulsePak Prime...
Страница 38: ...38 PulsePak Prime GDED IOM 216 B...