Instruction manual SGS
61
gis
5. Switch off the solar heating system.
6. Connect a hose to the lowest drain point in the solar heating system.
7. Insert the hose into the glycol jerry can.
8. Open the valve of the lowest drain point.
9. Open the air bleed point (26) of the solar heating system.
10. Close the drain point when the jerry can is full.
11. Insert the hose in a new jerry can.
12. Repeat steps 6 and 7 until no further glycol comes out of the system.
13. Close the air bleed point and the valve of the drain point.
14. Remove the hose.
Note
Dispose of the drained glycol in an environment-friendly manner, and
according to local regulations.
Содержание SGS - 100
Страница 7: ...4 Instruction manual SGS gis...
Страница 11: ...Contents 8 Instruction manual SGS...
Страница 23: ...Working principle of the water heater 20 Instruction manual SGS 2 gis...
Страница 37: ...Installation types 34 Instruction manual SGS Installation 3...
Страница 57: ...Conversion to a different gas category 54 Instruction manual SGS 4 is...
Страница 65: ...Draining 62 Instruction manual SGS 6 gis...
Страница 71: ...Status of the water heater 68 Instruction manual SGS 8 gis...
Страница 75: ...Shutting down 72 Instruction manual SGS 10 gis...
Страница 103: ...Service interval 100 Instruction manual SGS 14 is...
Страница 112: ...Instruction manual SGS 109 is...
Страница 117: ...Appendices 114 Instruction manual SGS 17 is 17 5 Declaration of conformity Declaration of conformity...
Страница 119: ...Instruction manual SGS 116...