Operating and Assembly Instructions – A.B.S. Flexilo ECO for wood pellets
Assembly
Subject to technical change
Issue 09/2016
Page 18 of 32
©A.B.S. Silo- und Förderanlagen GmbH
Connect the frame feet with the base plates and the flat angles:
Assembly of the plug-in elements
Pay attention to the room layout with regard to entry door and filling set.
Check the room height.
If filling is executed inside the room, please note that the minimum distance from
the wall to the frame has to be 80 - 100 cm, on the side where the silo will be filled.
Plug the plug-in elements into the frame stands and then connect the drawing irons
to the outer side. To connect the drawing irons with the stands and the plug-in
elements use screws M12x130.
CAUTION: Please note, that on all the 4 silo sides, the boreholes in the feet
for the drawing irons must be at the same height – in other words, the feet
should not be twisted.
Protect yourself from falling frame feet and secure these during assembly.