![background image](http://html1.mh-extra.com/html/3m/charge-analyzer-711/charge-analyzer-711_quick-start-manual_3158023006.webp)
3M™ Model 711 Digital Conversion Station
Quick Start Guide
6
©3M June 2000
Before You Begin
Before You Start Unpacking the Conversion Station
•
Review all of the Warning and Caution Statements and Safety Instructions on pages 2
through 5.
•
Be very careful when removing the Conversion Station from the shipping crate. You will
remove the machine from the shipping crate using a ramp. Be very careful when moving the
machine down the ramp and onto the floor.
Before You Start Setting up the Conversion Station
•
DO NOT PLUG THE CONVERSION STATION INTO AC POWER.
Major Steps Involved in the Conversion Process
Here is an overview of the major steps involved:
•
Unpack, set up, and start up the Conversion Station.
•
Load the D1 tag dispenser.
•
Set the library parameters in the software.
•
Review the online documentation.
•
Create a conversion plan.
•
Train operators and set schedules.